Discovery resources

Sales discovery

How to measure business impact in a discovery call

Turn a buyer’s example into a baseline you can both check. Find out how often it happens, what it costs in time or delay, and what you still need to verify.

Start with one job the buyer remembers

When a buyer says repeat visits take up too much of the week, ask them to walk through the last one. “What was the technician sent to fix? What did they find on site? What had to happen before the customer could use the equipment again?” Let the buyer describe the sequence before you put a number on it.

In this fictional example, Lea runs a service depot. A technician arrived on Monday with a seal for the wrong pump model. The depot ordered the right part and went back on Thursday. The customer waited three days between visits. The technician logged 25 minutes of hands-on work on the return visit. Both numbers matter. The delay tells you when the customer could use the pump. The logged minutes tell you how much technician time that extra visit took, excluding travel and dispatch work.

Check whether the cause is relevant to what you can change. “Was this a one-off order error, or can the team usually see the pump model before dispatch?” If bookings routinely lack a model number, you have a condition to check in other jobs.

Count comparable jobs over a stated period

Ask for a numerator, a denominator and a period. Lea chooses four completed weeks at one depot. The depot carried out 120 first repair visits in that period. Twelve jobs needed an unplanned second visit within seven days because the first visit left the repair incomplete. Planned two-part jobs are outside both counts. Lea waited until each job had been observed for seven days before checking the record.

Twelve divided by 120 is 10% for that depot and period. Record what counted, who pulled the numbers and where they came from. Ask whether those weeks included a different mix of jobs, a stock issue or seasonal demand. A rate from one depot tells you where to look next. It gives you little basis for a company-wide forecast.

Show what was measured and what you estimated

One depot’s four-week baseline
Frequency
12 of 120 eligible jobs needed an unplanned second visit within seven days.
Measured time
Eight of the 12 second visits had usable hands-on time logs. They totalled 200 minutes and ranged from 15 to 35 minutes each.
Working estimate
If the four untimed visits were similar, add four times 15 to 35 minutes. That gives 260 to 340 hands-on minutes in total, or 4 hours 20 minutes to 5 hours 40 minutes. The figures exclude travel and dispatch.
Still unknown
The missing jobs may have been more involved. Lea still needs to check their time and how many second visits a better booking process could have prevented.

Ask whether the eight timed visits resemble the four missing ones. If technicians only log time on straightforward jobs, the observed range could be too low. Keep the 200 minutes as the measured total for those eight visits and leave the four blank until you can check them. If you test a new booking step later, use the same job definition, reporting period and way of tracking technician time.

Agree what the impact means and what to check next

Ask Lea what the depot would do with fewer repeat visits. The technician might take a job from the backlog or cover another route. That is capacity the depot could use. A reduction in spending needs separate evidence, such as overtime that could actually be avoided. If the main consequence is customer delay, track that separately and ask which commitments the delay affects.

Close with a small request the buyer can accept or correct. “Could you and dispatch check the four missing time logs and mark which of the 12 repeat visits came from an incomplete booking? I’ll send our definition and calculation for you to correct before we meet on Thursday. Then we can decide whether the booking step is worth testing.”

If Lea has no way to get the records, ask what she can observe next week. Start the next conversation with a count you can both check. Hold off on annual estimates until you know whether the period is typical.

Download the editable impact worksheet

Use one worksheet per problem. Start with a recent job and keep measured facts, assumptions and missing evidence in separate fields.